02Sectors

Safety decking for apartment blocks

Safety decking for multi-storey apartment and mid-rise residential frames. One survey, a rolling install pattern, a deck that moves up the building in step with the trades.

Graceland operative in branded hi-vis and hard hat on an upper floor of a block-built scheme
  • 1996
    Original safety decking
  • Class 3
    BS EN 12811-1:2003
  • SSIP
    FASET & SMAS accredited
  • 48 hr
    Quote turnaround

One survey. One pattern. Every floor the same.

An apartment frame is the best argument for Trad Deck ever made. Four storeys, eight storeys, ten — the floor plate repeats. The opening geometry repeats. The M&E riser repeats. Every constraint that makes a housing plot bespoke disappears once you are above level one on a mid-rise residential frame.

That repetition is the whole reason apartments are the fastest unit cost we quote. We survey the first floor once, issue a pattern, and the same two- or three-person crew lays an identical platform on floor two, floor three and floor four. The deck moves up the building in step with the follow-on trades — not behind them, not ahead of them.

One survey. One pattern. Every floor the same. — Graceland safety decking

What a principal contractor running an apartment frame actually needs

A deck that moves with the programme. On a mid-rise frame the trades above the deck — M&E, plastering, dryliners — cannot wait while a fresh survey happens on every floor. The answer is not to speed up the survey. The answer is to survey once and roll the install to a pattern.

No scaffold fight. Most apartment blocks do not want an additional birdcage scaffold eating the floor plate just to give the trades above a working platform. Trad Deck is installed from the first-floor opening and carried up through the building. In most layouts no additional scaffold is needed at all.

A crew that does not get in the way of the frame crew. On a live frame job there is always a concrete crew, a steel crew or a panel crew working around you. Our install sequence assumes they are there, and we plan around their pour dates and strike windows rather than around our yard diary.

What a principal contractor running an apartment frame actually needs — Graceland safety decking
03Process

How a rolling-pattern apartment install works

How a rolling-pattern apartment install works — Graceland on site
  1. 01

    Single-floor pre-start survey

    We walk level one with your PM and frame manager. Because the floor plate repeats, this is effectively the survey for every floor.

  2. 02

    Pattern issue

    You get one panel layout, one leg-unit schedule, one RAMS pack, one delivery plan — not one set of paperwork per floor.

  3. 03

    Rolling install

    The same crew lays floor two, then floor three, then floor four, to the pattern. Each floor gets a jointly countersigned Handover Certificate.

  4. 04

    Between-floor interval matches your frame cycle

    We do not come back in a month. We come back when your concrete is cured or your steel is bolted up and you want the working platform in.

  5. 05

    Floor-by-floor dismantle as the trades above finish

    Instead of one big dismantle at the end, we take the deck out floor by floor as the ceilings close. Keeps your stored-panels footprint on site small.

Trad Deck or G-Deck on an apartment frame

On the majority of residential mid-rise frames we install Trad Deck. The yellow polypropylene panels are light to carry up a frame, fast to lay to a pattern and — critically — the plastic compound absorbs low-level dropped-tool impact in a way a steel deck does not. That matters on a live floor where M&E operatives are working above the deck.

Where a floor plate is a better fit for lightweight steel handling, quick positioning and rigid mesh panels, we may specify G-Deck Lite. Lite and Trad Deck both carry a published 2.0 kN/m² UDL, so the recommendation is made level by level from the layout, access and programme rather than a higher-load claim.

Trad Deck is a fall-prevention platform, not a crash deck. The TRAD user guide is explicit on the point, and on a mid-rise residential frame that is exactly the behaviour you want.

Trad Deck or G-Deck on an apartment frame — Graceland safety decking
05Compliance

Compliance, for your principal designer

Every deck we install on an apartment frame is Load Class 3 under BS EN 12811-1:2003, with a safe working load of 2.0 kN/m² UDL (inclusive of operatives on the deck) and Class B material fragility under ACR[M]001:2014. Every platform over 2m is inspected and recorded under the Work at Height Regulations 2005, with a jointly countersigned Handover Certificate issued per floor on install and after any alteration. Every operative is CSCS-certified and every install is FASET-compliant. The full Trad Deck user guide and loadings chart are available on request and will be issued with the pre-start RAMS pack.

Who you will be dealing with

On apartment installs it is typically Paul Darrington or Ewan Craig on the level-one survey. The rolling install on floors two and upwards is run by one of our senior installers, with Paul or Ewan back out if the frame throws up a level that does not match the pattern. Whoever picks up the phone when you call is the person who can make a decision on your frame.

Nationwide from St Neots. Core regions: Cambridgeshire, Bedfordshire, Hertfordshire, Northamptonshire, Buckinghamshire, East Anglia and the Midlands.

Who you will be dealing with — Graceland safety decking
Quote within 48 hours · Talk to Paul or Ewan

Bring us in early — most jobs can be quoted from your drawings.